<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"><channel><title>Automation Engineering Notes: PLC, SCADA, Panels | Mekatrio</title><link>https://mekatrio.com/en/notes/</link><description>Practical technical guides on PLC and SCADA, Modbus RTU, 4-20 mA signals, alarm management, control panel standards, FAT and commissioning.</description><language>en</language><item><title>Alarm Management Guide: ISA-18.2, EEMUA 191, Alarm Rates</title><link>https://mekatrio.com/en/notes/alarm-management-guide/</link><guid isPermaLink="true">https://mekatrio.com/en/notes/alarm-management-guide/</guid><pubDate>Fri, 27 Nov 2026 00:00:00 GMT</pubDate><description>ISA-18.2 / IEC 62682 lifecycle, EEMUA 191 and HSE alarm rate targets; steps for a small plant, alarm list columns, rationalization worksheet and checklist.</description></item><item><title>Analog Measurement Chain: Sensor to SCADA Scaling</title><link>https://mekatrio.com/en/notes/analog-measurement-chain-guide/</link><guid isPermaLink="true">https://mekatrio.com/en/notes/analog-measurement-chain-guide/</guid><pubDate>Fri, 27 Nov 2026 00:00:00 GMT</pubDate><description>Guide to sensor selection, accuracy, 2-3-4 wire, 4-20 mA voltage budget, shielding, isolation, ADC, scaling, filtering, alarms, error budget and loop check.</description></item><item><title>Modbus RTU Guide: Frames, CRC, Timing</title><link>https://mekatrio.com/en/notes/modbus-rtu-complete-guide/</link><guid isPermaLink="true">https://mekatrio.com/en/notes/modbus-rtu-complete-guide/</guid><pubDate>Fri, 27 Nov 2026 00:00:00 GMT</pubDate><description>End-to-end Modbus RTU guide: frames and CRC, function codes, byte order, register maps, timing, exceptions and commissioning.</description></item><item><title>Operator HMI/SCADA Screen Design: ISA-101 Guide</title><link>https://mekatrio.com/en/notes/operator-hmi-design-guide/</link><guid isPermaLink="true">https://mekatrio.com/en/notes/operator-hmi-design-guide/</guid><pubDate>Fri, 27 Nov 2026 00:00:00 GMT</pubDate><description>HMI/SCADA operator screen design: ISA-101 approach, display hierarchy, color, alarms, trends, navigation, faceplates, common mistakes, checklist.</description></item><item><title>Operator Command Safety: Confirm, Lock, Quality</title><link>https://mekatrio.com/en/notes/operator-command-safety/</link><guid isPermaLink="true">https://mekatrio.com/en/notes/operator-command-safety/</guid><pubDate>Fri, 27 Nov 2026 00:00:00 GMT</pubDate><description>Reducing wrong clicks and commands based on stale data in SCADA: risk classes, confirmation window, press-and-hold, rate limit, quality lock.</description></item><item><title>OT Remote Access Security: VPN and Segmentation</title><link>https://mekatrio.com/en/notes/ot-remote-access-security/</link><guid isPermaLink="true">https://mekatrio.com/en/notes/ot-remote-access-security/</guid><pubDate>Fri, 27 Nov 2026 00:00:00 GMT</pubDate><description>Remote access to panels, PLCs and SCADA: network separation, VPN, roles and logging to settle first, with a practical framework and checklist.</description></item><item><title>CE Marking and TSE for Panels: What Is the Difference?</title><link>https://mekatrio.com/en/notes/panel-ce-marking-vs-tse/</link><guid isPermaLink="true">https://mekatrio.com/en/notes/panel-ce-marking-vs-tse/</guid><pubDate>Fri, 27 Nov 2026 00:00:00 GMT</pubDate><description>CE marking is the manufacturer's declaration; TSE is the standards body. General information on how low-voltage, EMC and machinery rules apply to panels.</description></item><item><title>Panel Standards Overview: Which Applies to Which Project?</title><link>https://mekatrio.com/en/notes/control-panel-standards-overview/</link><guid isPermaLink="true">https://mekatrio.com/en/notes/control-panel-standards-overview/</guid><pubDate>Fri, 27 Nov 2026 00:00:00 GMT</pubDate><description>IEC 61439, 60204-1, 60529, 60947, UL 508A, NFPA 79, TEDAŞ and CE: what each standard covers and which one to look at for which panel project.</description></item><item><title>Pump Station Control Logic: Level and Alternation</title><link>https://mekatrio.com/en/notes/pump-station-control-logic/</link><guid isPermaLink="true">https://mekatrio.com/en/notes/pump-station-control-logic/</guid><pubDate>Fri, 27 Nov 2026 00:00:00 GMT</pubDate><description>Pump station PLC logic: level stages, duty/standby rotation, dry-run lockout, sensor failure and test scenarios, with a made-up level example.</description></item><item><title>Level Measurement: Float, Hydrostatic, Ultrasonic</title><link>https://mekatrio.com/en/notes/level-measurement-selection/</link><guid isPermaLink="true">https://mekatrio.com/en/notes/level-measurement-selection/</guid><pubDate>Fri, 27 Nov 2026 00:00:00 GMT</pubDate><description>Comparing float, hydrostatic and ultrasonic level measurement for wells and tanks: grease, foam and condensation problems, backup and scaling.</description></item><item><title>Testing SCADA Screens Without a PLC</title><link>https://mekatrio.com/en/notes/testing-screens-without-a-plc/</link><guid isPermaLink="true">https://mekatrio.com/en/notes/testing-screens-without-a-plc/</guid><pubDate>Fri, 27 Nov 2026 00:00:00 GMT</pubDate><description>Trying a SCADA screen with simulated values before the PLC and panel are ready: what to test, which scenarios you need, and what simulation does not prove.</description></item><item><title>PLC and SCADA Tag Naming: Structure and Rules</title><link>https://mekatrio.com/en/notes/tag-naming-guide/</link><guid isPermaLink="true">https://mekatrio.com/en/notes/tag-naming-guide/</guid><pubDate>Fri, 27 Nov 2026 00:00:00 GMT</pubDate><description>PLC and SCADA tag naming: layers, name structure, rules, I/O list columns and change control, with a made-up pump station example.</description></item><item><title>Data Types for Tags: Handling Repeated Devices</title><link>https://mekatrio.com/en/notes/tag-types-and-repeated-devices/</link><guid isPermaLink="true">https://mekatrio.com/en/notes/tag-types-and-repeated-devices/</guid><pubDate>Fri, 27 Nov 2026 00:00:00 GMT</pubDate><description>Many identical pumps or motors? Do not create tags one by one: data types, an instance table, member settings and how to manage a type change.</description></item><item><title>Small Water and Wastewater Plant SCADA Guide</title><link>https://mekatrio.com/en/notes/water-wastewater-scada-guide/</link><guid isPermaLink="true">https://mekatrio.com/en/notes/water-wastewater-scada-guide/</guid><pubDate>Sat, 21 Nov 2026 00:00:00 GMT</pubDate><description>SCADA for small water and wastewater plants: I/O list, architecture, pump control, alarm design, security, FAT/SAT and operations in one end-to-end guide.</description></item><item><title>Panel Design and Standards: IEC 61439 Guide</title><link>https://mekatrio.com/en/notes/control-panel-design-standards/</link><guid isPermaLink="true">https://mekatrio.com/en/notes/control-panel-design-standards/</guid><pubDate>Sat, 21 Nov 2026 00:00:00 GMT</pubDate><description>A practical guide to IEC 61439, IEC 60204-1, IP/IK, temperature rise, wiring, labeling, FAT and commissioning for automation and distribution panel design.</description></item><item><title>HMI vs SCADA: Differences and How to Choose</title><link>https://mekatrio.com/en/notes/hmi-vs-scada/</link><guid isPermaLink="true">https://mekatrio.com/en/notes/hmi-vs-scada/</guid><pubDate>Thu, 19 Nov 2026 00:00:00 GMT</pubDate><description>HMI vs SCADA explained with PLC and historian: how they differ and how to choose by tag count, PLC count, alarm logging, remote access and reporting.</description></item><item><title>Small-Plant SCADA Architecture: 1-5 PLCs</title><link>https://mekatrio.com/en/notes/small-plant-scada-architecture/</link><guid isPermaLink="true">https://mekatrio.com/en/notes/small-plant-scada-architecture/</guid><pubDate>Thu, 19 Nov 2026 00:00:00 GMT</pubDate><description>SCADA architecture for 1-5 PLCs and about 5000 tags: layers, server/client, protocol choice, redundancy, network segmentation and tag counting.</description></item><item><title>Biogas Automation and SCADA: Digester to Engine</title><link>https://mekatrio.com/en/notes/biogas-plant-automation-scada/</link><guid isPermaLink="true">https://mekatrio.com/en/notes/biogas-plant-automation-scada/</guid><pubDate>Thu, 19 Nov 2026 00:00:00 GMT</pubDate><description>Digester, gas line, flare and CHP automation at a biogas plant; ATEX warnings, H2S, what to monitor in SCADA and a checklist.</description></item><item><title>Water &amp; Wastewater SCADA: Architecture, Checklist</title><link>https://mekatrio.com/en/notes/water-wastewater-plant-scada/</link><guid isPermaLink="true">https://mekatrio.com/en/notes/water-wastewater-plant-scada/</guid><pubDate>Thu, 19 Nov 2026 00:00:00 GMT</pubDate><description>PLC, communications and SCADA architecture for pumping, storage and treatment sites; common field problems and a pre-installation checklist.</description></item><item><title>Modbus RTU Errors: Step-by-Step Troubleshooting</title><link>https://mekatrio.com/en/notes/modbus-rtu-troubleshooting/</link><guid isPermaLink="true">https://mekatrio.com/en/notes/modbus-rtu-troubleshooting/</guid><pubDate>Thu, 19 Nov 2026 00:00:00 GMT</pubDate><description>Timeouts, CRC errors or dropouts on a Modbus RTU line? A symptom table and a field checklist in order: physical, settings, protocol.</description></item><item><title>4-20 mA or 0-10 V? Choosing an Analog Signal</title><link>https://mekatrio.com/en/notes/4-20ma-vs-0-10v/</link><guid isPermaLink="true">https://mekatrio.com/en/notes/4-20ma-vs-0-10v/</guid><pubDate>Thu, 19 Nov 2026 00:00:00 GMT</pubDate><description>Choosing between 4-20 mA and 0-10 V: a field guide to live zero, noise, cable length, shunts, 2/3/4-wire, wire breaks and common mistakes.</description></item><item><title>Modbus RTU RS-485 Line Design: Termination, Bias</title><link>https://mekatrio.com/en/notes/modbus-rtu-rs485-line-design/</link><guid isPermaLink="true">https://mekatrio.com/en/notes/modbus-rtu-rs485-line-design/</guid><pubDate>Thu, 19 Nov 2026 00:00:00 GMT</pubDate><description>RS-485 daisy-chain topology, termination at both ends, single-point bias, shield and poll time calculation: a field checklist for Modbus RTU.</description></item><item><title>NAMUR NE43 and PLC Analog Scaling: Wire Break</title><link>https://mekatrio.com/en/notes/namur-ne43-plc-analog-scaling/</link><guid isPermaLink="true">https://mekatrio.com/en/notes/namur-ne43-plc-analog-scaling/</guid><pubDate>Thu, 19 Nov 2026 00:00:00 GMT</pubDate><description>Catching a 4-20 mA wire break in the PLC: NE43 current thresholds, scaling raw values to engineering units, a fault bit and a checklist.</description></item><item><title>Shield Grounding: Analog and Communication Cables</title><link>https://mekatrio.com/en/notes/shield-grounding-guide/</link><guid isPermaLink="true">https://mekatrio.com/en/notes/shield-grounding-guide/</guid><pubDate>Thu, 19 Nov 2026 00:00:00 GMT</pubDate><description>Ground the shield at one end or both? Ground loops, 360° termination and a checklist for analog, Modbus RTU and drive cables.</description></item><item><title>FAT checklist: panel and SCADA acceptance test</title><link>https://mekatrio.com/en/notes/fat-checklist/</link><guid isPermaLink="true">https://mekatrio.com/en/notes/fat-checklist/</guid><pubDate>Thu, 19 Nov 2026 00:00:00 GMT</pubDate><description>A practical checklist for panel and SCADA factory acceptance testing (FAT): documents, visual checks, I/O, communication, alarms, scenarios, open items.</description></item></channel></rss>