← Documents and tools
Quote Preparation Checklist
Fill in only the section for the service you need. Missing items do not block a quote: a drawing, P&ID, photo or a two-line description is enough. Write "Not sure" for anything you do not know. Scope, duration and price are project-specific.
Project name Short description
Files are sent to the email address on the contact page (the form has no file field).
General
Item Have Missing Not sure File name / note
Drawing, P&ID, photo or a two-line description
Site location (city / region, country)
Survey, cost and progress payment
Item Have Missing Not sure File name / note
Project documents
Contract unit prices
Progress payment periods
Process design and feasibility
Item Have Missing Not sure File name / note
Target capacity
Raw material and product information
Site layout
Budget range
R&D and reverse engineering
Item Have Missing Not sure File name / note
The part itself or photos of it
Operating conditions
Annual quantity needed
Mechanical design
Item Have Missing Not sure File name / note
Description of the job or a hand sketch
Load and operating conditions
Material preference
Existing model, if any
Panel design and manufacturing
Item Have Missing Not sure File name / note
Motor and load list (power, voltage)
Site conditions (indoor, outdoor, dust, humidity)
Preferred brand, if any
Industrial automation
Item Have Missing Not sure File name / note
Brand and model of existing PLC and drives
Number of inputs and outputs (approximate)
P&ID or electrical project, if available
SCADA installation
Item Have Missing Not sure File name / note
P&ID or process diagram
PLC brand and count
Approximate tag count
Remote access requirement
Field installation and commissioning
Item Have Missing Not sure File name / note
Site location
Duration of the work
Who will supply the installation crew
Existing project documents
Turnkey small systems
Item Have Missing Not sure File name / note
What the unit will do
Capacity
Site connection points
Delivery date
Training
Item Have Missing Not sure File name / note
Which hardware your team should be trained on