Skip to content
TRRequest a quote

Documents and tools

Templates and calculators that may help on panel, automation and SCADA work. The templates can be printed from your browser; the calculators do not send your inputs anywhere.

Templates

The templates are a general starting point. Adapt the scope, acceptance criteria and values to your project.

  • FAT form (factory acceptance test)

    A printable A4 portrait form. It covers documents before the test, visual and mechanical inspection, I/O, communication, alarm and scenario tests, records, a punch list and sign-off. You mark each item as passed, failed or not applicable.

  • Quote preparation checklist

    An A4 list divided by service. For each item you mark have, missing or not sure. Missing items do not block a quote; a drawing, P&ID, photo or a two-line description is enough.

  • I/O list

    A landscape A4 template with columns for tag, description, type (DI, DO, AI, AO, communication), PLC address, field device, range, unit and alarm limits for each signal. The italic rows are examples from a pump station; delete them or replace them with your project.

  • Alarm list

    A landscape A4 template with columns for alarm text, source tag, condition, delay, priority, delivery channel, expected operator action, acknowledgement and owner. It is built on the principle that every alarm requires an action; the example rows are examples only.

The templates are for general information and are not legal or standards-compliance documents. Acceptance criteria that apply to a project follow the specification in your contract.

Calculators

The calculators are for preliminary checks; verify the results against device documentation and the relevant standard. Your inputs are processed in your browser and are not sent anywhere.

  • 4-20 mA and PLC raw value scaling

    Enter a current (mA) or a PLC raw value to see the equivalent, the engineering value and the NAMUR NE43 status. You enter the raw range; the tool does not guess it.

  • Modbus RTU poll and scan time

    From baud rate, parity, and the number of devices and registers, it roughly calculates the time of a single read and the time to scan all devices once. The result is a lower-bound estimate; real time is longer depending on devices and master software.

  • Control panel thermal estimate

    Enter the total heat loss and the enclosure surfaces exposed to air to roughly see the inside and outside temperature difference. It is a preliminary check, not a design approval.

  • SCADA scale check

    Enter your PLC and tag counts to see how your project relates to the scale stated on our site. It is preliminary information; the actual scope depends on the project.

Tell us about your project.

You can also write to us without filling in the templates; a drawing, a photo or a short description is enough.