Skip to content
TRRequest a quote

General Manufacturing

Special machine and fixture design, conveyors and material handling, control system replacement on legacy machines and reverse engineering for spare parts.

In general manufacturing, every factory has its own machine park, handling layout and legacy systems. For jobs that cannot be solved with a standard product, special machine and fixture design, handling lines, renewal of old machines and remanufacturing of parts without spares are the typical needs of this sector.

What do we do in general manufacturing?

  • Mechanical Design. Design of machines, fixtures and tooling specific to the need, manufacturing drawings and assembly follow-up.
  • Conveyors and material handling. Design of systems that carry, feed and discharge the product inside the line.
  • Industrial Automation. Control system replacement on old machines: modernizing machines with sound mechanics with a PLC, drives and HMI.
  • R&D and Reverse Engineering. For spare parts: measuring and redrawing parts that have no drawing or cannot be found.

Renewing old machines

A machine’s mechanics can run for years; the problem is often on the control side: a controller with no spare parts, undocumented relay logic, an aged operator panel. In that case, renewing the control system instead of replacing the whole machine can be an economical path. We described how to build the measurement chain in our analog measurement chain guide.

Typical workflow

A special machine or fixture job usually runs in this order: writing down the need and constraints, concept and calculations, a 3D model, manufacturing drawings, manufacturing and assembly follow-up, electrical and control, commissioning. Renewing an old machine starts differently: first the machine, drawings and operating logic are examined, then what will change is decided. For spare-part work, the part is measured, modeled and handed over as a drawing ready for manufacturing.

Typical measurements and signals

Signal Where What automation uses it for
Product presence Conveyor, feed point Sequence and synchronization
Position and limit Cylinder, axis, cover Motion verification, safe operation
Speed and rotation Conveyor, motor, drum Line speed, drive setting
Motor current Drive, motor output Detecting overload and jams
Temperature Motor, bearing, process Protection and alarms
Pressure Pneumatic and hydraulic lines Operating condition, maintenance alert
Emergency stop and safety inputs Around the machine Safe stop circuit

Automation topics

  • Motor and drive selection. The right drive and motor combination for the load, speed range and stopping accuracy.
  • Control logic and operator screen. The machine’s sequence, manual and automatic modes, and clear fault messages; see the operator screen design guide.
  • Machine safety. Emergency stop and protection circuits; the applicable requirements are set by the machine and the target market.
  • Diagnostics. Showing on screen which sensor or drive is faulty shortens maintenance time.
  • Documents after a retrofit. Handing over new drawings, the I/O list, a software backup and operator information.

Common field problems

  • A machine with no documents. Without drawings and software, the operating logic of the machine has to be worked out first.
  • A part with no spares. A part whose maker is gone, or that takes long to arrive from the supplier, needs remanufacturing.
  • Mechanical and electrical interface. If sensor location, motor flange or cable route was not considered in the mechanical design, assembly runs into trouble.
  • Missing measurements. In reverse engineering, a wrong or missing dimension shows up in the part that comes back from manufacturing.
  • Vibration and jams. On handling systems, misalignment or an undersized motor causes repeated failures.
  • A weak operator interface. A screen that does not say why a fault occurred prolongs the stoppage.

What we need to quote

  • What will the machine or system do; what are the capacity, speed and working environment?
  • If there is an existing machine, are there drawings, software and photos; is it still running?
  • What are the size, weight and material of the product or part?
  • What are the electrical and signal interfaces (motor power, sensors, communication)?
  • For spare-part work, do you have the part itself or photos and the yearly quantity needed?
  • How long is the downtime window; can production be stopped during the changeover?
  • Which documents do you want to receive?

Start with what you have: a hand sketch, a photo or a two-line description is enough. Time and cost depend on the project.

How we proceed

We first inspect the machine and the existing documents on site and put the scope and the risks in writing. Because the same team handles mechanical design, panel and software, losses at the interfaces are reduced. Scope, duration and acceptance criteria are set according to the contract.

Frequently asked questions

Can the control system of an old machine be renewed?

If the mechanical structure is sound, most of the time yes. Old relay logic or a controller with no spare parts can be replaced with a PLC, drives and an operator screen. First the existing machine, drawings and operating logic are examined; then what will change is decided.

What is reverse engineering?

It means measuring and examining a part or assembly you have in hand to obtain its drawing, material and dimension information. It is used to remanufacture parts that have no spare available or whose drawings have been lost.

How does special machine design proceed?

Needs and constraints are clarified, a concept solution and calculations are made, a 3D model and manufacturing drawings are prepared. Manufacturing and assembly follow-up and, where needed, commissioning come next. Stages and approval points are set according to the project.

What is needed to design a conveyor or material handling system?

You need the size and weight of the product, speed and capacity, line length and layout, the working environment and the feeding and discharge points. With this information the mechanical design, motor and drive selection and control logic are developed together.

Does production stop during a retrofit?

A stoppage is needed for the changeover but its length can be shortened: methods include preparing and pre-testing the new panel and software and fitting the changeover into a planned downtime window. Planning is done during the survey.

Can I have a small system built turnkey?

Yes. For small systems, getting design, manufacturing, panel, software and commissioning from one team reduces interface problems and unclear responsibility. Scope and handover are clarified in the contract.

I only have an old machine, with no drawings or software. Can we start?

Yes. We inspect the machine on site, work out its operating logic and signals, and prepare the drawings and I/O list for the new control system from scratch. Photos and, if available, the manufacturer's nameplate information are enough to start.

Which documents will I receive on handover?

It depends on the job: a 3D model and manufacturing drawings, electrical drawings, an I/O list, a software backup and operator information are typical handovers. The document list is put in writing at the quote stage.

Send us the problem. We reply within one business day.

A drawing, a P&ID, a photo or two lines of description is enough.