Skip to content
TRRequest a quote

Operator HMI/SCADA Screen Design: ISA-101 Guide

HMI/SCADA operator screen design: ISA-101 approach, display hierarchy, color, alarms, trends, navigation, faceplates, common mistakes, checklist.

Published: · Author: Mekatrio team

A good operator screen tells the state of the plant in a few seconds and leads the eye to the right place when something is wrong. A bad screen shows everything at the same brightness; the problem gets lost among colors and numbers. What matters is not how nice the screen looks, but how quickly the operator notices an abnormal condition.

This guide summarizes the main ideas of the ISA-101 approach and the screen rules that are practical for a small plant. For the difference between HMI and SCADA and which one is enough, see HMI vs SCADA; for the architecture the screens connect to, small-plant SCADA architecture; for carrying a measurement value together with its quality information, the analog measurement chain. There is also a note on biogas automation for biogas-specific information. We do not repeat them here.

Status of the sources

ANSI/ISA-101.01-2015 (“Human Machine Interfaces for Process Automation Systems”) is a paid standard; we have not seen its full text and give no clause numbers. The ISA-101 statements below rely on a single technical article (Control.com, in Sources). The article describes the gray look as a “popular approach”; we do not present it as a requirement. Some of the rules in this guide come not from the standard but from general good practice or from our own suggestions; we say so where relevant.

1. Philosophy first, then screens

According to the Control.com article, ISA-101 recommends preparing a style guide before the first screen is drawn; its topics include display levels, navigation, symbol and text standards, faceplates, alarm organization and trending. In a small plant it is one or two pages:

  • Which color means what?
  • Text sizes and the decimal place rule.
  • Display types and what each one shows.
  • The alarm display rule.
  • The control and confirmation rule.
  • Symbol and element naming.

In a project without a style guide, each screen is drawn by a different person in a different way, and the operator has to learn again on every screen.

2. Display hierarchy

This four-level structure is our suggestion; we do not present the number of levels as a requirement of the standard. In a small plant you can build it like this:

Level Content Example
1. Overview State of the whole plant, critical values, alarm summary Process flow and summary table
2. Unit Flow of one unit, control mode, setpoints A reactor or a pump group
3. Equipment Faceplate: state, control, detailed values A single motor, a single valve
4. Support Trend, alarm list, diagnostics, help Trend and alarm screens

Rule: going from overview to detail, the number of values grows and the scope narrows. On the overview the operator sees where the problem is; in the detail they look for the cause.

Example process screen of a biogas plant showing six digesters, the gas treatment line and four gas engines on one screen (simulation).

Example project, simulation: the overview screen shows feeding, six digesters, the gas treatment line and four gas engines from left to right, with a “Plant summary” panel on the right. Each digester and gas engine box has a “Detay” (detail) button.

Diagram of a digester with a membrane gas holder: agitators, valves, gas analysis and an operation panel (simulation).

Example project, simulation: a unit screen. It shows the diagram of a single digester, three agitators, valves, measurement indicators, a gas analysis panel and, on the right, an “operation” panel with mode selection and setting fields.

3. Use of color

According to the Control.com article, ISA-101 tends toward a more monochromatic scheme: contrasting shades of gray for background and objects, with color used sparingly, only where attention is needed, such as alarms and abnormal equipment. Practical rules:

  • Give color a meaning and keep it the same on every screen. Write it into the style guide.
  • Do not use alarm colors for another purpose (pipes, decoration, equipment state).
  • Color alone should not carry information. Use shape and text for alarms too; this is needed for operators with weak color discrimination and for screens with glare.
  • Use blinking sparingly; only for alarms waiting for acknowledgement.
  • Heavy 3D objects, animation and decorative color carry no information and distract. The article also lists them among the problems of older screens. The same view on shadows and gradients is ours.
  • Try the screen in real conditions: control room lighting and the brightness of a screen on a field panel are different.

4. Values and indicators

  • Write the unit next to the value.
  • Choose decimal places according to the meaningful resolution of the measurement; a temperature with five digits gives a false impression of accuracy.
  • Instead of a bare number, a bar or mini indicator that shows the range tells at a glance whether the value is in the normal region.
  • Mark alarm and setpoint limits on the indicator.
  • Quality information: If the measurement is faulty, do not show the last value frozen; show gray or a dash and “fault” (details in the measurement chain note).
  • Stale data: if communication is lost, the screen values should be marked “old”; otherwise everything looks normal.

5. Alarm display

  • On every screen, in the same place, have an alarm banner and priority counters. The operator should see the alarm whichever screen they are on.
  • Go from the alarm banner to the alarm list with one click.
  • Mark the equipment in alarm on the process screen too (an alarm indicator next to the symbol). This way the operator goes from the screen to the cause, not from the list to the screen.
  • Separate priority classes by shape, color and text.
  • Show acknowledgement state: unacknowledged, acknowledged but still active, cleared but not acknowledged.
  • Have an indicator on the screen for suppressed or shelved alarms; they should not stay silently hidden.
  • The alarm content (threshold, cause, action) needs alarm management work; the screen alone does not fix a bad alarm.

The example images in this guide do not show an alarm banner or alarm counters; try the rules in this section on your own plant’s screens, not on the images.

  • A trend answers the operator’s question “what happened, and where is it going?” Show related values together (for example, the measured value and the setpoint).
  • Put series that share a unit or magnitude range in one chart; do not squeeze very different scales onto one axis.
  • Keep the number of series readable; each series’ color and current value should appear in the legend line.
  • Time range selection, live/pause, a cursor (reading between two points) and data export are the basic functions.
  • Choose the axis range fixed or meaningful; automatic scaling can make small noise look like a large swing.
  • When measurement quality is bad, a gap or marker should show in the trend.

Six trend charts for digester temperatures, membrane holders, biogas production, methane content, electrical power and gas balance (simulation).

Example project, simulation: the trend screen. Six charts are shown; each has an Online selector, a time range list, and Stop, Ruler, Statistics, Copy and CSV buttons, with a colored legend row below showing the current value of each line.

7. Navigation

  • A fixed navigation bar: in the same place on every screen, with the current screen highlighted.
  • A way back to the overview from every screen.
  • Up and down the hierarchy, and a move to the neighboring unit (e.g. “next unit”).
  • Practical suggestion (not from the standard): reaching a critical screen should not take more than a few clicks; try this with a stopwatch in your own plant.
  • Screen names should be in process language, using the names the operator uses.

8. Control and faceplate

A faceplate is the detail window of an equipment item (motor, valve, PID); it should have the same layout throughout the project.

Section Content
State Running, stopped, fault, interlock; the reason is written
Mode Automatic, manual, maintenance
Control Start, stop, setpoint, fault reset
Values Details such as current, speed, temperature
Limits Alarm thresholds, setpoint limits
Alarm Active alarm of this equipment
Trend shortcut Trend of the related series

Control rules (general good practice):

  • Show the command and the actual state separately: “start commanded” and “running” are different things.
  • An unauthorized user should not be able to operate; define authority levels for mode changes and critical commands.
  • Ask for a second step (confirmation) on critical commands; not on every button, only where justified, otherwise confirmation becomes a reflex.
  • Check lower and upper limits on setpoint entry.
  • If a command is refused (interlock, mode), write the reason on the screen.
  • A simulation or test switch should not be on a production screen, or it should be protected by authority.

Gas engine and generator diagram, four analog gauges, and electrical and mechanical/thermal value tables (simulation).

Example project, simulation: the gas engine screen. On the left, the engine and generator diagram, Start, Stop and Fault reset buttons, an Automatic switch and status indicators; on the right, four analog gauges and “Electrical” and “Mechanical / thermal” value tables.

9. Common mistakes

  • Filling the process flow diagram like a photograph; showing every pipe and valve.
  • Every value in the same size and color; it is not clear what matters.
  • Color used just for decoration.
  • Alarm colors used elsewhere.
  • Everything blinking.
  • Values without units, numbers that do not show measurement quality.
  • The old value freezing and looking normal when communication is lost.
  • A different faceplate layout on each screen.
  • Navigation that is too deep.
  • Drawing the screen to one person’s taste without asking the operator.
  • The alarm list and the screen not linked.

10. Checklist

  • Is the style guide written (color, text, symbols, alarms, control)?
  • Is the display hierarchy defined?
  • Are color meanings fixed and alarm colors reserved?
  • Is an alarm distinguished by shape and text as well as color?
  • Is there an alarm banner and counters on every screen?
  • Do values carry units and quality information?
  • Is loss of communication visible on the screen?
  • Does the trend have time range, cursor and export?
  • Is the navigation bar fixed, with a return to the overview?
  • Is the faceplate in the same layout for every equipment item?
  • Are command and state separate, and do critical commands have confirmation and authority?
  • Were the screens tried under real lighting and with the operator?
  • Were the screens reviewed in the FAT? (FAT checklist)

11. Example screens and ISA-101

The images above are simulation screens of the biogas example project; they are not a real plant. ISA-101 is used in this example only partially and as an inspiration. The images show a gray background, input boxes with a yellow fill, and a screen order that runs from the overview to digester and gas engine detail and on to the trends. The alarm screen and alarm banner are not in these images. The screens have not been audited against the standard. This example screen does not implement the whole standard.

If you want to rearrange your screens around how the operator uses them on site, or design them from scratch for a new project, take a look at our SCADA installation and screen design page.

Sources

Tags

  • HMI design
  • SCADA screen design
  • ISA-101
  • operator screen
  • faceplate

Want to discuss this for your project?