HVAC and Building Automation

Automation, drive commissioning and energy monitoring for air handling units, chillers and pump groups; existing systems brought onto one screen.

In buildings and plants, the HVAC system consists of air handling units, chillers and pump groups, and was often installed at different times with different brands. The purpose of automation is to deliver comfort and process conditions while making energy use visible, noticing faults early and making the operation manageable from one place.

What is done in HVAC automation?

  • Air handling unit (AHU) control. Managing fans, dampers, valves and filter status according to temperature, humidity and pressure measurements.
  • Chillers and pump groups. Sequenced operation of cooling and heating groups, standby pump changeover, alarm management.
  • Industrial Automation. Drive commissioning: parameterizing pump and fan drives, their communication with the PLC, adjusting the speed to demand.
  • Energy monitoring. Collecting meter and analyzer data and following consumption over time.

Bringing existing systems onto one screen

In the field, every device often has its own panel. If the devices offer an interface such as Modbus or BACnet, their data can be gathered under one SCADA. Alarms, trends and reports are then seen in one place. For the communication line, our Modbus RTU RS-485 line design article covers the basic checkpoints.

Typical process and equipment

An HVAC system usually has three parts: the equipment that produces heating or cooling (chiller, boiler, heat pump), the pump groups and piping that carry that energy, and the air handling units and terminal units such as fan coils that transfer it to the air. Automation makes these three work together: the air handler calls for water, the pump group supplies it, and the production equipment follows the load.

Typical measurements

Measurement Where What automation uses it for
Air temperature and humidity Supply, return and room Heating, cooling and humidity control
Duct pressure Supply duct Fan speed adjustment
Filter differential pressure Air handler filter Filter replacement alert
CO₂ Room or return air Fresh air amount by demand
Water temperature Supply and return lines Chiller and pump decisions, efficiency monitoring
Flow Pump group, main line Load calculation, pump speed
Valve and damper position Air handler, line Feedback, fault detection
Electrical energy and power Panel, drive, chiller Consumption monitoring and reporting

Automation and SCADA topics

  • Schedules and setpoints. Operating hours and temperature targets by building use; a record of manual interventions.
  • Sequencing and standby. Chillers and pumps staged in by demand, changeover to standby on a fault.
  • Protection functions. Functions such as freeze protection on an air handler, or stopping the fan on a fire damper or smoke signal, are defined according to the project and the relevant specification.
  • Drive use. Adjusting pump and fan speed to demand; the drive’s communication with the PLC.
  • Energy monitoring. Meter and analyzer data shown in trends and reports.
  • Combining different devices. For data arriving over interfaces such as Modbus and BACnet, see the Modbus RTU guide and RS-485 line design articles.

Common field problems

  • A valve that keeps opening and closing. If the control tuning (PID) does not match the delay in the field, the valve and temperature oscillate.
  • A badly placed sensor. A sensor affected by airflow or sunlight misleads the whole control.
  • Forgotten manual mode. Equipment left in “hand” after maintenance uses energy unnoticed.
  • Different brands from different eras. When every device has its own language and its own panel, bringing them onto one screen is harder.
  • Communication address and line problems. Two devices with the same address, or an RS-485 line with wrong termination, cause intermittent dropouts; see Modbus RTU troubleshooting.
  • Too many alarms. When every small deviation is an alarm, operators stop reacting to them.

What we need to quote

  • How many air handlers, chillers, pumps and terminal units are there, and where?
  • What are the brands, models and communication interfaces (Modbus, BACnet and so on) of the existing controllers, drives and meters?
  • Is there an existing monitoring screen; what data is already collected?
  • What is the goal for the building or process: comfort, temperature and humidity accuracy, an energy report, remote monitoring?
  • Which alarms should go to whom?
  • Do you have equipment documents, drawings and a P&ID?
  • Which time windows suit work on running systems?

A two-line description and an equipment list are enough to start. Time and cost depend on the project.

How we proceed

We first make an inventory of the existing devices and their communication interfaces and decide together which data is needed. Panel, software and site commissioning are handled by the same team. Scope and acceptance criteria are set according to the project.

Frequently asked questions

What is air handling unit automation?

It means managing the fans, valves, dampers and filter status of an air handling unit with a controller (PLC). Heating, cooling and ventilation are adjusted automatically from temperature, humidity and pressure sensor data; alarms and running hours are tracked as well.

What does chiller and pump group automation provide?

It provides coordinated and sequenced operation of the chiller, pumps and related valves, standby pump changeover, fault alarms and monitoring of energy use while the load is adjusted with drives.

Why does using a drive (VFD) on pumps and fans save energy?

On centrifugal pumps and fans, power is roughly proportional to the cube of the speed. When the flow demand drops, reducing the speed uses far less energy than throttling with a valve. The real saving depends on the system's load profile; energy monitoring makes it measurable.

Which communication protocols are used in building automation?

Modbus and BACnet are the ones met most often in the field. Which protocol a device supports is determined from the device documentation; a protocol converter (gateway) is used when needed.

Can existing devices from different brands be brought under one SCADA?

Usually yes. If the devices have a communication interface (such as Modbus or BACnet), their data can be brought into one SCADA. Old devices without an interface need an extra module or a signal connection. First an inventory of the existing system is made.

What is needed for energy monitoring?

You need meters or energy analyzers at the measurement points, a PLC or data collector that reads them, and a screen that shows the data. Which points are measured depends on the report you aim for.

What is freeze protection on an air handler?

It is the function that stops water in the heating coil from freezing and bursting the pipe in cold weather: based on the temperature sensor and thermostat, the valve opens, the fan stops and an alarm is raised. Which protection stages are built depends on the unit and the specification.

Can automation be renewed while the system is running?

Partly. The changeover can be done unit by unit or group by group with short planned stops; the whole building does not have to stop at once. The sequence and downtime windows are set at the survey.

Send us the problem. We reply within one business day.

A drawing, a P&ID, a photo or two lines of description is enough.