Technical notes.
Short, practical write-ups on topics we meet in the field and at the desk.
Tags
SCADA Installation
Alarm Management Guide: ISA-18.2, EEMUA 191, Alarm Rates
ISA-18.2 / IEC 62682 lifecycle, EEMUA 191 and HSE alarm rate targets; steps for a small plant, alarm list columns, rationalization worksheet and checklist.
- alarm management
- ISA-18.2
- IEC 62682
- EEMUA 191
- alarm rationalization
Operator HMI/SCADA Screen Design: ISA-101 Guide
HMI/SCADA operator screen design: ISA-101 approach, display hierarchy, color, alarms, trends, navigation, faceplates, common mistakes, checklist.
- HMI design
- SCADA screen design
- ISA-101
- operator screen
- faceplate
Operator Command Safety: Confirm, Lock, Quality
OT Remote Access Security: VPN and Segmentation
Remote access to panels, PLCs and SCADA: network separation, VPN, roles and logging to settle first, with a practical framework and checklist.
- remote access
- OT security
- VPN
- network segmentation
Testing SCADA Screens Without a PLC
PLC and SCADA Tag Naming: Structure and Rules
Data Types for Tags: Handling Repeated Devices
Small Water and Wastewater Plant SCADA Guide
SCADA for small water and wastewater plants: I/O list, architecture, pump control, alarm design, security, FAT/SAT and operations in one end-to-end guide.
HMI vs SCADA: Differences and How to Choose
Small-Plant SCADA Architecture: 1-5 PLCs
SCADA architecture for 1-5 PLCs and about 5000 tags: layers, server/client, protocol choice, redundancy, network segmentation and tag counting.
- SCADA
- architecture
- OPC UA
- Modbus TCP
- Siemens S7
- network segmentation
Biogas Automation and SCADA: Digester to Engine
Digester, gas line, flare and CHP automation at a biogas plant; ATEX warnings, H2S, what to monitor in SCADA and a checklist.
- biogas plant SCADA
- biogas automation
- digester
- ATEX
- H2S
Water & Wastewater SCADA: Architecture, Checklist
PLC, communications and SCADA architecture for pumping, storage and treatment sites; common field problems and a pre-installation checklist.
- water and wastewater SCADA
- pumping station
- wastewater treatment
- remote monitoring
- SAİS
Industrial Automation
Analog Measurement Chain: Sensor to SCADA Scaling
Guide to sensor selection, accuracy, 2-3-4 wire, 4-20 mA voltage budget, shielding, isolation, ADC, scaling, filtering, alarms, error budget and loop check.
- analog measurement
- measurement chain
- 4-20 mA
- PLC analog input
- calibration
Modbus RTU Guide: Frames, CRC, Timing
End-to-end Modbus RTU guide: frames and CRC, function codes, byte order, register maps, timing, exceptions and commissioning.
- Modbus RTU
- RS-485
- CRC
- register map
- commissioning
Pump Station Control Logic: Level and Alternation
Pump station PLC logic: level stages, duty/standby rotation, dry-run lockout, sensor failure and test scenarios, with a made-up level example.
- pump station
- PLC logic
- level control
- water and wastewater
Level Measurement: Float, Hydrostatic, Ultrasonic
Comparing float, hydrostatic and ultrasonic level measurement for wells and tanks: grease, foam and condensation problems, backup and scaling.
- level measurement
- sensor selection
- water and wastewater
- analog signal
Modbus RTU Errors: Step-by-Step Troubleshooting
Timeouts, CRC errors or dropouts on a Modbus RTU line? A symptom table and a field checklist in order: physical, settings, protocol.
- modbus rtu
- rs-485
- troubleshooting
- communication
- industrial automation
4-20 mA or 0-10 V? Choosing an Analog Signal
Choosing between 4-20 mA and 0-10 V: a field guide to live zero, noise, cable length, shunts, 2/3/4-wire, wire breaks and common mistakes.
Modbus RTU RS-485 Line Design: Termination, Bias
RS-485 daisy-chain topology, termination at both ends, single-point bias, shield and poll time calculation: a field checklist for Modbus RTU.
- Modbus RTU
- RS-485
- termination resistor
- bias
- line design
NAMUR NE43 and PLC Analog Scaling: Wire Break
Catching a 4-20 mA wire break in the PLC: NE43 current thresholds, scaling raw values to engineering units, a fault bit and a checklist.
- NAMUR NE43
- 4-20 mA
- PLC analog scaling
- wire break
- 27648
Shield Grounding: Analog and Communication Cables
Ground the shield at one end or both? Ground loops, 360° termination and a checklist for analog, Modbus RTU and drive cables.
- shield grounding
- ground loop
- analog cable
- Modbus RTU
- EMC
Control Panel Design and Manufacturing
CE Marking and TSE for Panels: What Is the Difference?
CE marking is the manufacturer's declaration; TSE is the standards body. General information on how low-voltage, EMC and machinery rules apply to panels.
- CE marking
- TSE
- low voltage regulation
- panel standards
- machinery safety
Panel Standards Overview: Which Applies to Which Project?
IEC 61439, 60204-1, 60529, 60947, UL 508A, NFPA 79, TEDAŞ and CE: what each standard covers and which one to look at for which panel project.
- panel standards
- IEC 61439
- IEC 60204-1
- UL 508A
- TEDAŞ
- CE marking
Panel Design and Standards: IEC 61439 Guide
A practical guide to IEC 61439, IEC 60204-1, IP/IK, temperature rise, wiring, labeling, FAT and commissioning for automation and distribution panel design.
- panel design
- IEC 61439
- IEC 60204-1
- temperature rise
- cable segregation
Site Installation and Commissioning
FAT checklist: panel and SCADA acceptance test
A practical checklist for panel and SCADA factory acceptance testing (FAT): documents, visual checks, I/O, communication, alarms, scenarios, open items.
- FAT
- acceptance test
- panel
- SCADA
- commissioning
Send us the problem. We reply within one business day.
A drawing, a P&ID, a photo or two lines of description is enough.