PLC and SCADA Tag Naming: Structure and Rules

PLC and SCADA tag naming: layers, name structure, rules, I/O list columns and change control, with a made-up pump station example.

Published: · Author: Mekatrio team

If the person maintaining a plant three years from now can find a pump’s run status under the same name in the PLC, on the SCADA screen and on the P&ID, half the job is done. If not, every fault first turns into a translation job: “Which PLC input was this P2_RUN in SCADA, and what was it on the drawing?” That is why tag naming is a decision that looks small but brings benefit or burden for years.

This article proposes a general naming scheme for a small or mid-size automation project. It is a practice suggestion, not a standard; if your plant or specification has its own rule, that comes first. The names below are made-up examples for explanation. Time and cost depend on the project.

1. Three layers, one name

The same physical signal lives in three places:

Layer Example Where
P&ID tag Level transmitter (example: LT-101) Process diagram, instrument list
PLC variable Well level measurement PLC program
SCADA tag Well level Screen, alarms, trends, reports

There should be a one-to-one traceable link between the three. The most practical way is to write each signal’s P&ID tag in the I/O list and generate PLC and SCADA tag names from that list. In many P&IDs, instrument tags are written in the style of the ISA 5.1 symbols and identification standard. According to ISA’s page, the standard’s title is “Instrumentation and Control: Symbols and Identification” and the current edition is ANSI/ISA-5.1-2024. The standard text is paid and is not reproduced here; check the current text for letter codes.

2. Name structure

A readable name answers “where, what, which signal.” An example structure:

AREA_EQUIPMENT_SIGNAL

For a made-up pump station:

Tag Meaning
WELL1_LT01_LEVEL Well 1, level transmitter 01, measured level
WELL1_P01_RUNNING Well 1, pump 01, run feedback
WELL1_P01_START Well 1, pump 01, start command
WELL1_P01_FAULT Well 1, pump 01, fault status
WELL1_LEVEL_HIGH_ALM Well 1, high-level alarm
WELL1_P_LEAD_SP Well 1, duty pump level setpoint

Area (station or process section), equipment (pump, valve, transmitter) and signal (level, running, fault) are three separate parts. The parts are written in a consistent order and with a consistent separator.

3. Rules

Rule Why
Avoid spaces and special characters, and non-ASCII letters Some PLC, SCADA and communication software may not carry them cleanly; ASCII is the safe choice
Decide on upper or lower case and do not change it Prevents confusion in searching and exporting
Write numbers with a fixed number of digits (P01, P02, … P10) Prevents P10 sorting before P2
Keep abbreviations in a list So everyone understands what an abbreviation means
Do not put the unit in the name; put it in the description If the unit changes, the name does not lie
Do not use temporary or personal names (TEST, NEW, JOHN) These stay on site for years
Use fixed suffixes for alarms, setpoints and commands (such as _ALM, _SP, _START) Lets you tell the type apart at a glance on screens and lists
Avoid long names Some systems have a character limit; they are also unreadable on screen

4. The I/O list: one source of truth

The I/O list is not only for wiring the panel; it is where tag names are born. Typical columns for a signal:

Column What goes in
Tag The name by the rules above
Description A full sentence a person can read
Type Digital input, digital output, analog input, analog output
Engineering unit m, bar, m³/h, °C and so on
Range Low and high value (for analog)
Alarm thresholds Low and high, if any
Panel location Card and channel
P&ID tag Its counterpart on the drawing
Note Wire-break behavior, interlock and so on

Prepare the list at the start of the project and keep it current throughout. Fitting the list to the field afterward is much harder than fitting the field to the list.

5. Tag count

One physical signal can produce several tags: a value, status information, alarm bits, a setpoint. Count all of them when estimating project scale. For the effect of tag count on architecture, see Small-Plant SCADA Architecture.

6. Change control

  • If a name changes, the PLC, SCADA, I/O list and P&ID change together.
  • Do not give the name of a deleted signal to another signal; it confuses old trends and reports.
  • Carry site changes into the as-built drawing and the list.
  • Back up the PLC and SCADA before every change.

7. The most common mistakes

  • One name in the PLC, another in SCADA.
  • Three different spellings for the same pump, such as P1, Pump1 and PMP_01.
  • The description field is empty; only a code is there.
  • An old sensor was replaced but the old one is still in the list.
  • The alarm tag and the measurement tag share no common root.

Checklist

  • The naming rule is written down and everyone knows it.
  • No spaces or special characters.
  • Numbers have a fixed number of digits.
  • There is an abbreviation list.
  • The I/O list contains the P&ID tags.
  • PLC and SCADA tag names were generated from the list.
  • Fixed suffixes are used for alarms, setpoints and commands.
  • Changes are carried into the list, the drawing and the backup.

Sources

For a ready starting point, open the I/O list template; adapt its columns to your project.