Food and FMCG

Automation, mechanical and hygienic design for filling, mixing and packaging lines: one team from installation to commissioning.

Food and FMCG production works in an environment with many products on the same line, frequent changeovers and regular cleaning. Automation here is not only about speed. Getting the same result from the same recipe every time, reducing the time lost at changeover and supporting hygiene through equipment design are also part of the job.

The role of automation in food lines

A typical line consists of raw material feeding, mixing, filling, capping, labeling and packaging steps. At every step the PLC reads sensor, drive and valve data, manages the machine sequence and informs the operator through the screen (HMI). As the line grows, knowing the difference between HMI and SCADA makes it easier to decide how to monitor several machines from one place.

Common needs

  • Installation and commissioning of filling, mixing and packaging lines. Mechanical assembly, panel, cabling, signal checks and trial runs.
  • Industrial Automation. Line modernization: renewing the PLC, drive and HMI side of lines whose mechanical structure is sound but whose control system has aged.
  • Mechanical Design. Stainless equipment designed for hygiene: platforms, tank supports and equipment in AISI 304 and AISI 316; cleanable surfaces and geometry that avoids dead zones.
  • Recipe-managed automation. Automatic application of parameters according to the selected product, batch-based records.

Typical process and line structure

Lines differ by product, but the order is usually: raw material receiving and storage, weighing or dosing, mixing, heat treatment where needed, filling, capping, labeling, case packing and palletizing. On the mixing and filling side, recipe and measurement accuracy matter; on the packaging side, speed and synchronization between machines do. On liquid product lines, clean-in-place (CIP) sequences for tank and pipe cleaning can also be part of the automation.

Typical measurements

Measurement Where What automation uses it for
Temperature Mixer, tank, heat treatment, CIP line Recipe step, product quality, cleaning verification
Level Tank, silo, filling hopper Feeding, filling and overflow protection
Flow and dosed amount Dosing line, filling Recipe quantity, batch record
Weight (load cell) Weighing, filling, checkweigher Correct quantity, reject decision
Pressure Line, air, steam Filling and capping stability
Conductivity CIP return line Passing a cleaning step (where used)
Product presence and counting Conveyor, packaging Synchronization between machines, production count
Motor and drive status Conveyor, pump, mixer Fault and stoppage records

Automation, HMI and SCADA topics

  • Recipe management. Applying parameters by product selection and defining which user may change which parameter.
  • Batch and production records. Storing batch, quantity and stoppage information; what is recorded and in how much detail depends on the need.
  • Changeover. Screens that reduce manual adjustment and guide the operator step by step.
  • Machine-to-machine communication. Filling, capping, labeling and packaging machines waiting for or buffering each other.
  • Alarms and stoppage cause. The operator quickly seeing what stopped the line; see the alarm management guide and the operator screen design guide.
  • Monitoring from one place. As the line grows, bringing several machines onto a shared screen; the HMI vs SCADA article frames that decision.

Common field problems

  • Manual adjustment at changeover. If parameters depend on the operator’s memory, the same product comes out differently each time.
  • Mismatched speeds between machines. Without buffer or wait logic, the line stops often.
  • Panels and sensors in washdown areas. Water, humidity and cleaning chemicals directly affect the protection class and material choice.
  • Fouled sensors. In sticky or dusty product environments, sensor position and cleaning access should be considered at the start.
  • Undocumented legacy software. On lines where the source code and I/O list are lost, even a small change takes long.
  • Stoppage cause not recorded. Without knowing what stopped and for how long, it is hard to set improvement priorities.

What we need to quote

  • Which machines are on the line and how are they connected (independent, or sharing a PLC)?
  • How many product types and recipes are there; who changes a recipe?
  • Brands and age of the existing PLC, drives and HMI; do you have the source code and drawings?
  • What are the washdown and cleaning methods, and the conditions (humidity, chemicals, temperature) where the equipment sits?
  • Which data must be recorded (batch, quantity, temperature, stoppage)? Does your customer or your own quality system require it?
  • How long can production be stopped; what conditions does a trial run with product need?
  • Is there a change on the mechanical side (platform, tank support, piping)?

A two-line line description and a few photos are enough to start. Time and cost depend on the project.

How we proceed

We first inspect the line and the existing system on site and put the scope and the risks in writing. Because the same team handles mechanics, panel and software, losses at the interfaces are reduced. We test the panel at the factory before shipment; for a detailed list, see our FAT checklist article. Scope, duration and acceptance criteria are set in each project according to the contract or technical specification.

Frequently asked questions

What does automation do in food production?

It makes sure the same recipe is applied the same way in every batch, reduces the time lost at product changeover and records production data (batch, quantity, stoppages). It also helps turn hygiene and traceability requirements into a systematic routine.

Is AISI 304 or AISI 316 used in food lines?

AISI 304 is common in general food environments. Where products contain chlorides, salt or acid, or where aggressive cleaning chemicals are used, AISI 316, which contains molybdenum, is preferred. The choice is made in the project according to the product, the cleaning method and the budget.

What is recipe management?

It means storing the product recipe (parameters such as ingredient quantities, sequence, time and temperature) in the PLC and HMI and applying it automatically for the selected product. The operator does not enter parameters by hand; selecting the product is enough. Who may change which parameters is defined in the project.

Can an old filling or packaging line be modernized?

Most of the time, yes. First the mechanical condition, the existing control system and the spare parts situation are examined. If the mechanical structure is sound, the control system, drives and operator interface can be renewed. Which parts will be replaced becomes clear after the survey.

How is commissioning done on a food line?

First the panel goes through a factory acceptance test (FAT), then site installation, signal and communication checks, and trial runs empty and with product follow. Duration and scope depend on the size of the line and the contract.

Can modernization be done without stopping production?

Minimizing the stoppage is possible: methods include preparing and pre-testing the new panel and fitting the changeover into a planned downtime window. A completely stop-free changeover is not possible on most lines; planning is done during the survey.

How are stoppages and efficiency tracked?

Run, stop and counter information from the machines' PLCs is collected and shown on a screen or in a report. The cause of a stoppage can be recorded with codes the operator selects or that are detected automatically. What is recorded and in how much detail is decided in the project.

How are panels and sensors protected in washdown areas?

Protection class, material (for example a stainless enclosure), panel location and cable entries are considered together. Where possible the panel is placed outside the direct washdown area. Conditions are determined at the survey and the decision is made per project.

Send us the problem. We reply within one business day.

A drawing, a P&ID, a photo or two lines of description is enough.