Food and FMCG production works in an environment with many products on the same line, frequent changeovers and regular cleaning. Automation here is not only about speed. Getting the same result from the same recipe every time, reducing the time lost at changeover and supporting hygiene through equipment design are also part of the job.
The role of automation in food lines
A typical line consists of raw material feeding, mixing, filling, capping, labeling and packaging steps. At every step the PLC reads sensor, drive and valve data, manages the machine sequence and informs the operator through the screen (HMI). As the line grows, knowing the difference between HMI and SCADA makes it easier to decide how to monitor several machines from one place.
Common needs
- Installation and commissioning of filling, mixing and packaging lines. Mechanical assembly, panel, cabling, signal checks and trial runs.
- Industrial Automation. Line modernization: renewing the PLC, drive and HMI side of lines whose mechanical structure is sound but whose control system has aged.
- Mechanical Design. Stainless equipment designed for hygiene: platforms, tank supports and equipment in AISI 304 and AISI 316; cleanable surfaces and geometry that avoids dead zones.
- Recipe-managed automation. Automatic application of parameters according to the selected product, batch-based records.
Typical process and line structure
Lines differ by product, but the order is usually: raw material receiving and storage, weighing or dosing, mixing, heat treatment where needed, filling, capping, labeling, case packing and palletizing. On the mixing and filling side, recipe and measurement accuracy matter; on the packaging side, speed and synchronization between machines do. On liquid product lines, clean-in-place (CIP) sequences for tank and pipe cleaning can also be part of the automation.
Typical measurements
| Measurement | Where | What automation uses it for |
|---|---|---|
| Temperature | Mixer, tank, heat treatment, CIP line | Recipe step, product quality, cleaning verification |
| Level | Tank, silo, filling hopper | Feeding, filling and overflow protection |
| Flow and dosed amount | Dosing line, filling | Recipe quantity, batch record |
| Weight (load cell) | Weighing, filling, checkweigher | Correct quantity, reject decision |
| Pressure | Line, air, steam | Filling and capping stability |
| Conductivity | CIP return line | Passing a cleaning step (where used) |
| Product presence and counting | Conveyor, packaging | Synchronization between machines, production count |
| Motor and drive status | Conveyor, pump, mixer | Fault and stoppage records |
Automation, HMI and SCADA topics
- Recipe management. Applying parameters by product selection and defining which user may change which parameter.
- Batch and production records. Storing batch, quantity and stoppage information; what is recorded and in how much detail depends on the need.
- Changeover. Screens that reduce manual adjustment and guide the operator step by step.
- Machine-to-machine communication. Filling, capping, labeling and packaging machines waiting for or buffering each other.
- Alarms and stoppage cause. The operator quickly seeing what stopped the line; see the alarm management guide and the operator screen design guide.
- Monitoring from one place. As the line grows, bringing several machines onto a shared screen; the HMI vs SCADA article frames that decision.
Common field problems
- Manual adjustment at changeover. If parameters depend on the operator’s memory, the same product comes out differently each time.
- Mismatched speeds between machines. Without buffer or wait logic, the line stops often.
- Panels and sensors in washdown areas. Water, humidity and cleaning chemicals directly affect the protection class and material choice.
- Fouled sensors. In sticky or dusty product environments, sensor position and cleaning access should be considered at the start.
- Undocumented legacy software. On lines where the source code and I/O list are lost, even a small change takes long.
- Stoppage cause not recorded. Without knowing what stopped and for how long, it is hard to set improvement priorities.
What we need to quote
- Which machines are on the line and how are they connected (independent, or sharing a PLC)?
- How many product types and recipes are there; who changes a recipe?
- Brands and age of the existing PLC, drives and HMI; do you have the source code and drawings?
- What are the washdown and cleaning methods, and the conditions (humidity, chemicals, temperature) where the equipment sits?
- Which data must be recorded (batch, quantity, temperature, stoppage)? Does your customer or your own quality system require it?
- How long can production be stopped; what conditions does a trial run with product need?
- Is there a change on the mechanical side (platform, tank support, piping)?
A two-line line description and a few photos are enough to start. Time and cost depend on the project.
Related notes
How we proceed
We first inspect the line and the existing system on site and put the scope and the risks in writing. Because the same team handles mechanics, panel and software, losses at the interfaces are reduced. We test the panel at the factory before shipment; for a detailed list, see our FAT checklist article. Scope, duration and acceptance criteria are set in each project according to the contract or technical specification.