Skip to content
TRRequest a quote

Glossary

Short definitions of the automation terms used in our notes and service pages. Where a note explains a term in detail, it is linked next to the term.

PLC (programmable logic controller)
Industrial controller that reads field inputs and runs the control logic.

HMI vs SCADA: Differences and How to Choose

HMI (human-machine interface)
The local screen through which an operator monitors and operates a machine or process.

HMI vs SCADA: Differences and How to Choose

SCADA
Supervisory layer that gathers many points for monitoring, alarms and records.

HMI vs SCADA: Differences and How to Choose

Historian
Component that stores time-stamped process data for trends and reports.

Water & Wastewater SCADA: Architecture, Checklist

RTU (remote terminal unit)
Remote device that collects signals at a site and relays them to the center.

Water & Wastewater SCADA: Architecture, Checklist

I/O list
List of all input/output signals with type, address and description.

Small Water and Wastewater Plant SCADA Guide

Tag
The name given to a single measurement or state value in SCADA.

Small-Plant SCADA Architecture: 1-5 PLCs

P&ID
Process diagram showing piping, equipment and instruments.

Water & Wastewater SCADA: Architecture, Checklist

FAT (factory acceptance test)
Acceptance test performed at the supplier before shipment.

FAT checklist: panel and SCADA acceptance test

SAT (site acceptance test)
Acceptance test performed on site after installation.

FAT checklist: panel and SCADA acceptance test

4-20 mA
Current-loop analog signal; 4 mA is the low end, 20 mA the high end.

4-20 mA or 0-10 V? Choosing an Analog Signal

NAMUR NE43
Recommendation defining signal ranges used to flag faults (e.g., wire break) on 4-20 mA. Confirm range values in the note and the standard.

NAMUR NE43 and PLC Analog Scaling: Wire Break

Scaling
Converting a raw PLC count to an engineering unit.

Analog Measurement Chain: Sensor to SCADA Scaling

Modbus RTU
Serial communication protocol commonly run over RS-485.

Modbus RTU Guide: Frames, CRC, Timing

RS-485
Multi-drop balanced serial line standard.

Modbus RTU RS-485 Line Design: Termination, Bias

Termination
Resistor at line ends that reduces reflections.

Modbus RTU RS-485 Line Design: Termination, Bias

Bias
Line polarization giving a defined level when the bus is idle.

Modbus RTU RS-485 Line Design: Termination, Bias

OPC UA
Vendor-neutral industrial data-exchange protocol.

Water & Wastewater SCADA: Architecture, Checklist

Hysteresis
Gap between on and off thresholds that prevents rapid cycling.

Small Water and Wastewater Plant SCADA Guide

Deadband
Band within which small changes are not recorded.

Small Water and Wastewater Plant SCADA Guide

Punch list
List of open items remaining after acceptance.

FAT checklist: panel and SCADA acceptance test

As-built
Documents updated to match what was actually installed.

Site Installation and Commissioning

Shield grounding
How and where a cable shield is grounded; it affects noise.

Shield Grounding: Analog and Communication Cables

ISA-18.2
Alarm-management lifecycle standard. Confirm clause details from the source.

Alarm Management Guide: ISA-18.2, EEMUA 191, Alarm Rates

ISA-101
Standard on operator screen (HMI) design for process automation systems. Confirm clause details from the source.

Operator HMI/SCADA Screen Design: ISA-101 Guide

Alarm flood
A large number of alarms arriving in a short time, making it hard for the operator to tell the important one.

Alarm Management Guide: ISA-18.2, EEMUA 191, Alarm Rates

Trend
A graph showing how a value changes over time.

SCADA Installation

Setpoint
The target value the control system tries to reach and hold for a measured variable.
PID
Control algorithm that produces an output from proportional, integral and derivative actions to hold a measured value at its target.
Interlock
Logic that allows a piece of equipment to run only when certain conditions are met.
Recipe
A product's parameter set (amounts, order, time, temperature and so on); applied automatically by the PLC when selected.

Industrial Automation

Variable frequency drive (VFD)
Electronic drive that adjusts motor speed by changing the supply frequency.

Shield Grounding: Analog and Communication Cables

Profinet
Ethernet-based industrial communication protocol.

Industrial Automation

Modbus TCP
The version of Modbus that runs over Ethernet.

Modbus RTU Guide: Frames, CRC, Timing

BACnet
Communication protocol used in building automation.

SCADA Installation

Register map
The address table of a device's readable and writable values; taken from the device documentation before communication is set up.

Modbus RTU Guide: Frames, CRC, Timing

Gateway (protocol converter)
A device that translates the data of one protocol into another; connects devices with different interfaces to one system.

Industrial Automation

VPN
A connection that sets up an encrypted tunnel between two networks or devices over the internet; used for remote access.

Small Water and Wastewater Plant SCADA Guide

DMZ (demilitarized zone)
A separate network zone between the control (OT) network and the office (IT) network, set up for passing data.

SCADA Installation

Network segmentation
Splitting a network into zones and limiting traffic between them with rules; makes it harder for a problem in one zone to spread to another.

Small-Plant SCADA Architecture: 1-5 PLCs

CIP (clean in place)
Automatic washing of tanks and pipes on food and beverage lines without dismantling them.
Dry running
A pump running with no liquid inside; risks overheating and damage, and is guarded by level or current information.
IP rating
Code showing an enclosure's protection against dust and water.

Panel Design and Standards: IEC 61439 Guide

Skid
A unit in which equipment such as a pump, filter or dosing system is assembled on a single frame.

Turnkey Small Systems

PFD
Process flow diagram showing the main steps and flows of a process in a simple form.

Process Design and Feasibility

Quantity take-off
Measuring a job's quantity items from the project and the site and putting them in a schedule.

Quantity Survey, Costing and Progress Payments

Progress payment
A contractor's payment claim for work done; checked by comparing it with quantities measured on site.

Quantity Survey, Costing and Progress Payments

FEA and CFD
FEA calculates a structure's stress and deformation under load; CFD calculates fluid flow numerically.

Mechanical Design

GD&T
Geometric dimensioning and tolerancing, a way of defining part geometry and tolerance with standard symbols.

Mechanical Design

Send us the problem. We reply within one business day.

A drawing, a P&ID, a photo or two lines of description is enough.