The panel is the least visible part of an automation project, yet the one we trust the most. If heat builds up inside the panel, the cables are untidy or the protective devices do not match each other, then no matter how good the PLC program is, the system will run into trouble at the first serious fault. A panel also sits in the middle of a chain of responsibility: who verified what, and who signed off on what?
This guide explains which standards you should look at when designing small and medium-sized industrial automation and distribution panels, how those standards relate to each other, and what to pay attention to in practice. Standard texts are paid documents and are not quoted clause by clause here; only the general framework is given. For numerical limits and details, you need to consult the current text of the relevant standard. This article is not legal or certification advice; confirm the details of CE and conformity responsibility with the standard text and with a competent/notified body. Matters such as duration and cost are determined per project.
Contents
- Which standards apply to which panel?
- CE and related regulations: how they relate to each other
- Design verification and routine verification
- Temperature rise and heat dissipation
- Busbars and short-circuit withstand: basic concepts
- Internal separation (segregation) forms
- Enclosure selection: IP, IK, material and ventilation
- Layout and wiring practice
- Shielding, grounding and EMC
- Labeling and documentation
- Coordination of protective devices
- FAT and commissioning
- The most common mistakes
- Commissioning checklist
- Frequently asked questions
1. Which standards apply to which panel?
Starting a panel project with the question “which standard?” greatly reduces the arguments that come up later. The table below shows the general framework; whether each row applies is determined by the project and the contract.
| Standard | What it is about | When it comes up in practice |
|---|---|---|
| IEC 61439 series | Low-voltage switchgear and controlgear assemblies (panels) | Distribution panel, motor control center, general-purpose automation panel |
| IEC 60204-1 | Electrical equipment of machines, general rules | Control panel on or connected to a machine |
| IEC 60529 | Degrees of protection provided by enclosures (IP code) | Enclosure selection against dust and water ingress |
| IEC 62262 | Degrees of protection provided by enclosures against external mechanical impacts (IK code) | Enclosure selection in environments with impact risk |
IEC 61439 series
IEC 61439-1 is the “general rules” standard: definitions, service conditions, construction requirements, technical characteristics and verification requirements are collected here. The product-specific parts refer back to this general standard. IEC 61439-2 covers power switchgear and controlgear assemblies (PSC) and is the product part most often consulted for an automation or distribution panel. This series applies to assemblies whose rated voltage does not exceed 1000 V AC or 1500 V DC. Individual devices (for example a circuit breaker or a motor starter) are not considered an “assembly” within the scope of this standard; the standard deals with the combined assembly of such devices.
The current edition of IEC 61439-1 is dated 2020 and replaces the 2011 edition. In Europe it is published as EN IEC 61439-1:2021. In Türkiye, this standard has been harmonized by TSE as the TS EN IEC 61439 series; for the exact number, edition year and validity status of the standard you use, consult TSE’s current catalog. Specifications may still use older numbering such as “TS EN 61439”; in that case, clarify up front which edition the specification means.
IEC 60204-1
This standard gives the general rules for the electrical, electronic and programmable electronic equipment of machines, and covers equipment whose rated supply voltage does not exceed 1000 V AC and 1500 V DC. The panel in a machine’s electrical equipment also falls within this framework. The current edition is dated 2016; a consolidated version including the 2021 amendment is also published by IEC. Which edition applies is determined by the reference in your contract and in the machine manufacturer’s conformity file.
The two standards are not rivals. A machine’s electrical panel often looks to 61439 as an assembly and to 60204-1 as the machine’s electrical equipment; where and how the two come together depends on the type of machine and the division of responsibility.
IEC 60529 and IEC 62262
The IP code (IEC 60529) expresses the enclosure’s degree of protection against dust and water ingress; the IK code (IEC 62262) expresses its degree of protection against external mechanical impacts. They are two separate standards: the impact digit that was once appended to the IP code is now given by a separate IK code. We cover them in the enclosure selection section.
2. CE and related regulations: how they relate to each other
When it comes to panels, three EU legal acts come up frequently; in Türkiye they have been harmonized with the relevant national regulations.
| Regulation | In brief | Effect on the panel |
|---|---|---|
| Low Voltage Directive 2014/35/EU | Safety framework for electrical equipment in the 50-1000 V AC and 75-1500 V DC voltage range (except the exclusions listed in Annex II) | Electrical safety of the panel, general framework |
| EMC Directive 2014/30/EU | Equipment must not disturb others and must withstand disturbances in its environment | Wiring, filtering, shielding, grounding |
| Machinery Directive 2006/42/EC | Safety and health requirements for machinery | If the panel is part of a machine, an input to the machine’s conformity file |
It is worth keeping a few points clear:
- The Low Voltage Directive overlaps, in terms of voltage range, with the range covered by 61439 and 60204-1. Its counterpart in Türkiye is the regulation on electrical equipment designed for use within certain voltage limits.
- The EMC Directive takes a separate approach for fixed installations: there is no requirement for a formal conformity assessment and CE marking for the fixed installation itself; however, the installation is expected to be set up with good engineering practice and for this to be documented. For apparatus built specially for a single fixed installation and not otherwise placed on the market, some obligations are also relaxed, but the EMC characteristics and the measures taken must be documented. Its counterpart in Türkiye is the Electromagnetic Compatibility Regulation (Elektromanyetik Uyumluluk Yönetmeliği) (2014/30/AB, Official Gazette (Resmî Gazete) 02.10.2016, no. 29845).
- Machinery legislation is in a transition period. In the EU, Machinery Regulation 2023/1230 will replace Directive 2006/42/AT. In Türkiye as well, a new Machinery Safety Regulation (Makine Emniyeti Yönetmeliği) corresponding to this regulation was published in the Official Gazette (Resmî Gazete) dated 16 October 2026; most of its provisions enter into force on 20.01.2027 and it repeals the old regulation. A transitional provision means products properly placed on the market before that date are not prevented from being made available on the market. Check how this transition affects your project according to the project’s date and the machine manufacturer’s approach.
A note on responsibility: Questions such as who owns the CE marking, whether the panel is assessed on its own or as part of a machine, and which harmonized standards are applied vary by project. This guide does not rule on these. Confirm the details of conformity responsibility with the standard text and with a competent body (a notified body, if necessary); for the list of harmonized standards, also consult the current list under the relevant legislation.
3. Design verification and routine verification
This is the most important conceptual change that IEC 61439 brought: the conformity of a panel is demonstrated by two separate verifications.
Design verification
It shows that the design meets the requirements of the standard. It is carried out once and is valid for panels that use the same design. There are generally three verification methods:
- Verification by testing
- Verification by calculation
- Verification by design rules (comparison with a previously tested reference design)
Which characteristic can be verified by which method is set out in a table in the standard; not every method is valid for every characteristic. For example, for short-circuit withstand strength you may need to demonstrate the result by calculation or testing, while for some characteristics design rules are also accepted. Confirm from the standard’s table which method is applicable to which characteristic.
Routine verification
It shows that each individual panel that is produced has been built correctly and in accordance with the design. In other words, it is a check of the workmanship, the materials used and the assembly quality. It is carried out separately for every panel.
Original manufacturer and assembly manufacturer
Under the 61439 approach, two roles are separated:
- Original manufacturer: The party that does the design and is responsible for the related design verifications. This party can often be a system manufacturer (manufacturers that offer a busbar system, enclosures and a product family).
- Assembly manufacturer (panel builder): The party that puts the panel together and takes responsibility for the completed panel. If it builds in accordance with the original manufacturer’s instructions, it carries out the routine verification.
If the assembly manufacturer deviates from the structure verified by the original manufacturer, that is, changes the configuration, it is considered the original manufacturer with respect to that change and must carry out the relevant design verification.
Practical consequence: if you use a verified panel system within the manufacturer’s instructions, the job is largely routine verification and correct assembly; if you step outside the system, the question of design verification comes up.
4. Temperature rise and heat dissipation
All the devices inside a panel generate heat: circuit breakers, contactors, drives, power supplies, even the conductors. If the heat cannot be dissipated, the internal temperature rises, component life shortens, protective devices may trip early and electronic devices fault.
The general approach in design is as follows:
- Power loss inventory: Add up the power loss (in watts) of each component from the manufacturer’s data sheet. Conductor and busbar losses are included. Manufacturers generally provide this data; the panel builder is responsible for doing the calculation.
- Enclosure heat dissipation capacity: The enclosure manufacturer provides heat dissipation data according to material and surface area. The installation method (against a wall, free-standing, side by side) affects this capacity.
- Comparison and internal temperature estimate: The total loss is compared with the enclosure’s heat dissipation capacity; where necessary, the calculation methods given in the standard and in the technical report it refers to are used for the internal air temperature rise.
- Cooling decision: If passive (natural) ventilation is not enough, solutions such as a fan with filter, a heat exchanger or an air conditioner are considered. This choice depends on the environmental conditions (dust, humidity, temperature) and the IP level target.
The standard recognizes testing, calculation and design rules as methods for verifying temperature rise; which method is valid in which current range and the permitted temperature limits are determined by the standard text and the manufacturer documents. This guide gives no limit values; use the figures in the data sheet and in the standard.
Practical notes:
- The ambient temperature limit in component data sheets must be compared with the internal temperature of the panel, not with the outside ambient temperature.
- If you use a fan with filter, write the filter maintenance into the maintenance plan; a clogged filter is a silent cause of overheating.
5. Busbars and short-circuit withstand: basic concepts
In small automation panels the busbar system may be limited, but in distribution panels or motor control sections, busbars and short-circuit withstand are a core subject. The standard defines a few key values on this; they are declared by the party that produces the panel:
- Rated short-time withstand current (Icw): The r.m.s. value of the short-circuit current that the panel can carry without damage for a specified time (unless otherwise stated, the default time in the standard is used).
- Rated peak withstand current (Ipk): The highest peak value of short-circuit current the panel can withstand; it indicates electrodynamic (mechanical) stress.
- Rated conditional short-circuit current (Icc): The prospective short-circuit current that a circuit protected by a short-circuit protective device (SCPD) specified by the manufacturer can withstand for the operating time of that device.
What this means in use: The prospective short-circuit current at the point where you will connect must not exceed the panel’s declared values. You should obtain this value from the energy distribution company, from the facility’s transformer data or by calculation, and write it into the panel specification. Without this value, it is not possible to say “short-circuit withstand is sufficient.”
Practical points:
- At low prospective currents the short-circuit verification requirement may be relaxed; for threshold values, refer to the standard text.
- The short-circuit protective device and the panel values must be considered together (see section 11).
6. Internal separation (segregation) forms
61439-2 classifies the separation between the busbars, the functional units (outgoing circuits) and the external cable terminals inside the panel as “forms”. The general framework is as follows:
| Form | General idea |
|---|---|
| Form 1 | No internal separation |
| Form 2 (2a/2b) | Busbars are separated from the functional units; the subtypes differ according to whether the external terminals are separated from the busbars |
| Form 3 (3a/3b) | Functional units are also separated from each other |
| Form 4 (4a/4b) | External cable terminals are also separated from each other; the subtypes differ according to whether the terminals are in the same compartment as their own unit |
A higher form generally makes maintenance easier in terms of being able to work on one circuit while leaving the others energized, but it increases cost and volume. Which form suits which project is determined by the maintenance and continuity-of-service requirement. For the full definitions of the subtypes and the differences between editions, refer to the standard text; only the general idea is given here.
7. Enclosure selection: IP, IK, material and ventilation
IP and IK
- The IP code (IEC 60529) gives the degree of protection against dust and water ingress. It is chosen according to conditions such as the type of dust in the environment, washing or rain exposure, humidity and condensation. In outdoor, wastewater or food environments, the need can be very different.
- The IK code (IEC 62262) indicates resistance to mechanical impact. It is the question to ask in situations such as forklift traffic, visitor access and vandalism risk. The code range was extended by the standard’s 2021 amendment; refer to the standard for the current situation.
The IP class is a property not only of the enclosure but of the whole assembly together with cable glands, door gaskets, ventilation elements and surface-mounted devices. As you drill holes and add elements, you need to confirm that the class is maintained.
Material
Sheet steel (painted steel), stainless steel and polyester (plastic) enclosures are common. The choice is made according to corrosion (chemical, salty, humid environments), impact, UV, weight and heat dissipation requirements. Plastic enclosures may need separate measures for grounding and shielding.
Ventilation and condensation
- Natural ventilation can conflict with a high IP target. Establish this balance between IP and heat dissipation from the start.
- If there is a condensation risk in a humid environment, a small panel heater and thermostat can be considered.
- For an outdoor enclosure that receives sun, the internal temperature will be higher than in the shade; reflect this in the heat calculation.
8. Layout and wiring practice
A good layout makes both manufacturing and fault finding easier. General principles:
- Functional grouping: Group the power section (circuit breaker, contactor, drive), the control section (PLC, relay, I/O) and the communication section. If possible, place the power and control sections in separate zones.
- Accessibility: Elements that are frequently worked on (fuses, relays, test points) should be near the front. Leave enough room for connecting cables to terminals.
Separating power and signal cables
Running power and signal cables side by side in the same duct can cause noise and misreadings in analog signals such as 4-20 mA (see our article on 4-20 mA or 0-10 V). The general approach in manufacturer guides is as follows:
- Divide cables into classes (for example power, control, analog signal, communication) and leave distance between the classes or use grounded metal separators. One manufacturer guide recommends keeping signal lines about 200 mm away from power lines; this value varies by manufacturer and product, so consult the guide for the component you use.
- If cables must cross, cross them at a right angle (90°).
- Placing power electronics (drive, power supply) and sensitive control electronics in different areas of the panel is the basis of the EMC zoning approach.
Terminal and wire marking
- Every terminal and every wire must be marked with its number on the schematic. Wire marking must be present at both ends, because during a fault a wire marked at only one end is often of little use.
- Group terminals by function (power supply, digital input, analog input, communication) and use labels or separators between groups.
- The number of conductors connected to each terminal point and the cross-section combination must comply with the limits stated in the terminal manufacturer’s data sheet.
Conductor colors
Standards and specifications give certain rules for conductor colors (phase, neutral, protective earth, control circuits, DC); however, this guide does not give a color table, because the editions in which colors apply and their exceptions should not be written down without being verified against the standard text. For the color scheme you will use, consult the relevant standard text, the specification and the facility’s internal rules; state the scheme you choose clearly in the schematic and documentation.
9. Shielding, grounding and EMC
If EMC is not designed well in a panel, a system that appears to work will occasionally throw “ghost” faults. Common recommendations from manufacturer guides are as follows:
- Zoning: Keep noise-generating sections (drive, contactor, power supply) and sensitive sections (analog input, communication, PLC) away from each other or separate them with an grounded plate.
- Shield continuity: On shielded cables such as motor cables, communication cables and analog signal cables, the shield must not be cut; it must be grounded with low impedance at the panel entry point (wide contact area, generally a 360° connection). Glands and shield clamps are designed for this job.
- Shield connection method: Whether the shield is grounded at one end or at both ends is determined by the signal type, cable length and the manufacturer’s instructions. We covered this topic in detail in our shield grounding article.
- Mounting plate and earth network: Use the metal mounting plate as a good earth reference; make the devices’ earth connections short and with a wide contact area. A painted surface can prevent contact.
- Grounding continuity: Protective earth continuity is among the checks covered by routine verification; the details of the measurement are determined by the standard.
A reminder on EMC: the EMC Directive requires that a device’s emissions be limited and that it show adequate immunity to disturbances in its environment. For panels installed in a fixed installation, it is expected that the application of good engineering practice be documented; for this reason, write the measures you take (filter, shielding, grounding method) into the documentation.
10. Labeling and documentation
When the panel is delivered, you should have the following:
| Document | What it is for |
|---|---|
| Electrical schematics (power, control, terminal plan) | Fault finding, modification, maintenance |
| I/O list | The bridge between field signals and PLC addresses |
| Bill of materials (BOM) | Spare parts, reordering, manufacturer verification |
| Layout and mounting plan | The internal arrangement of the panel, enclosure and component layout |
| Temperature rise and short-circuit assessment | Record of the assumptions the design rests on |
| Test and verification records | Routine verification and FAT results |
| Operation and maintenance notes | Panel information for the operator and maintenance team |
| Nameplate and markings | Manufacturer/assembler information and assembly data |
Consistency between the schematic and the I/O list
If a terminal number on the schematic matches an address in the I/O list and a tag in the PLC program, fault finding takes minutes instead of hours. Three documents using different names means constant lost time in the field. The tag naming convention should be written at the start of the project and stay the same across all documents. On this topic, you can also look at the I/O list section of our water and wastewater SCADA guide.
Nameplate and markings
The panel carries nameplate data such as the manufacturer’s name and identification information; which information is mandatory and how it is written is determined by the standard text and the relevant legislation. A nameplate with missing or different information is the first place looked at in any dispute over responsibility and conformity.
11. Coordination of protective devices
The protective devices in a panel must be selected to be compatible with each other and with the load they supply. The key questions:
- Overload protection: For the motor and cable, this is provided by a thermal relay, a motor protection circuit breaker or the drive’s own protection.
- Short-circuit protection: This is done with a circuit breaker or fuse; the breaking capacity must be appropriate for the prospective short-circuit current at the point of installation.
- Selectivity (discrimination): In a fault, the aim is for only the protective device nearest to the faulty branch to trip. This is assessed by consulting the manufacturers’ selectivity tables and curves.
- Motor starter coordination: Selecting the circuit breaker, contactor and thermal relay together is done according to the manufacturers’ coordination tables.
The most important thing to know here is that a panel rating is not the sum of the individual element ratings. The selected circuit breaker, together with the busbar and cable, determines the panel-level short-circuit values (see section 5). The figures are determined by the project, the manufacturer documents and the relevant standard text.
12. FAT and commissioning
Testing the panel in the workshop before it goes to site catches most errors cheaply. FAT (factory acceptance test) covers the following:
- Mechanical and visual check: conformity to the schematic, labels, tightening, cable routes, enclosure.
- Basic electrical checks: continuity, grounding, insulation, line and supply verification (method and values according to the standard and project specification).
- Functional test: input/output check, simulation, interlocks, emergency stop, alarm and communication test.
- Documentation check: conformity of the schematic, I/O list and BOM with the panel.
For a detailed outline of these tests, see our FAT checklist. On site, SAT is carried out: real devices are connected, sensors read real values, motors run in the correct direction, and alarms reach the right person. If the panel is part of a SCADA system, also take a look at our small facility SCADA architecture article for communication design and architecture decisions.
13. The most common mistakes
| Mistake | Consequence | Precaution |
|---|---|---|
| Skipping the heat calculation | Unexplained faults in summer, shortened device life | Power loss inventory, comparison with the enclosure capacity |
| Assuming a panel rating without knowing the short-circuit current | The panel rating does not cover the current at the installation point | Obtain the prospective short-circuit current in writing |
| Deviating from the verified system without realizing it | Design verification gap, unclear responsibility | Follow the manufacturer’s instructions; if you deviate, determine the verification |
| Putting power and signal cables in the same duct | Noise on the analog signal | Divide into classes, use distance or an grounded separator |
| Grounding a shield only partway or cutting it | EMC problems | Wide-contact shield connection at the panel entry |
| Drilling the enclosure and compromising the IP rating | Water and dust ingress | Suitable glands and gaskets, IP check after drilling |
| Not marking wires and terminals | Fault finding takes longer | Marking at both ends, consistency with the schematic |
| Schematic, I/O list and program mismatch | Lost time in the field | Single naming convention, as-built revision |
| Not clarifying the standard edition | Specification dispute | State the edition and year in the contract |
| Skipping FAT | Problems show up on site and cost more | Function and fault scenario testing in the workshop |
14. Commissioning checklist
The list below is a starting point; the scope and values are determined by the project and the relevant standard text.
Before energizing
- Do the schematic, bill of materials and the actual state of the panel match?
- Are all terminals and wires marked and matching the schematic?
- Has the tightening check been done (especially power connections)?
- Has protective earth continuity been verified?
- Have insulation and other applicable electrical checks been done (method and values per the specification)?
- Do the short-circuit protective device and its values match the schematic?
- Do the cable entries and glands maintain the IP target?
While energizing
- Are the supply voltage and phase sequence as expected?
- Was power applied in stages (control first, then power)?
- Is there any unexpected heating or smell?
- Did the PLC, HMI and communication devices power up normally?
Functional
- Has every input and output been tested with a real field signal or by simulation?
- Has the analog input cable-break condition been tested?
- Do the interlocks and emergency stop work?
- Do alarms reach the right person?
- When power is cut and restored, does the system return to the expected state?
Handover
- Have the as-built schematics, I/O list, BOM and test records been handed over?
- Has a backup of the PLC and HMI project been taken?
- Are the nameplate and markings complete?
- Have the maintenance notes (filter, tightening, periodic checks) been written?
Where to start?
First put the specification and the applicable standard editions in writing; then clarify the prospective short-circuit current at the installation point, the environmental conditions and the heat load. Make the selection of enclosure, busbars and protective devices with these inputs. Writing down the design verification and routine verification responsibilities (who does what?) at the start prevents most of the arguments that would come up at handover. For questions about conformity and CE responsibility, consult the standard text and a competent body. Duration and cost are determined by the scope and the project.
15. Frequently asked questions
Does every automation panel fall under IEC 61439, or under IEC 60204-1? It depends. The IEC 61439 series covers low-voltage switchgear and controlgear assemblies (panels); IEC 60204-1 gives the general rules for the electrical equipment of machines. For a machine panel, both are often consulted. Confirm which one applies in which scope against the standard texts and the contract specification.
Is the company that builds the panel the “original manufacturer”? Not always. Under the 61439 approach, the party that does the design and design verification and the party that builds the panel and carries out routine verification can be different organizations. If the manufacturer’s verified system is used within its conditions, the roles stay separate; if it is modified, responsibility may shift. For details, refer to the standard text.
How should I choose the IP and IK rating for a panel? It is chosen according to the dust, water and mechanical impact risk in the environment. The IP code states the protection class against dust and water ingress (IEC 60529), and the IK code against mechanical impact (IEC 62262). Which class is sufficient is determined by the installation location, the washing and cleaning conditions, and the specification.
How long does panel design and manufacturing take, and how much does it cost? Duration and cost depend on power, number of circuits, product selection, scope and verification needs. It would not be right to give a fixed figure; it is determined per project.
If you would like to plan the design, manufacturing and testing of your automation or distribution panel together, take a look at our Panel design and manufacturing page.