Water and wastewater plants are spread out: wells, pump stations, tanks and treatment units can be kilometers apart. In a setup where the operator cannot visit every point often, automation and monitoring are the only practical way to see what the plant is doing.
The role of automation in water and wastewater plants
Typical applications are pump management by level and pressure at pump stations, dosing and aeration control at treatment units and level monitoring at tanks. If all these points are monitored from a center, alarms and history are gathered in one place. We described the typical architecture and common field problems in our water and wastewater plant SCADA and small water and wastewater plant SCADA guide articles.
What we do
- Pump station and dosing automation.
- Process Design and Feasibility. P&ID; defining equipment, piping and measurement points.
- Control Panel Design and Manufacturing. Pump, drive and control panels.
- Tank and piping design.
- SCADA Installation. Remote monitoring.
Typical process and equipment
In drinking and utility water the chain usually runs from a well or source through a pump station and transmission line to storage tanks and the distribution network. Treatment plants add pre-treatment, chemical dosing, settling or filtration and disinfection. In wastewater the typical order is screening, a pump station, biological treatment (aeration), settling and a sludge line. Automation differs at each step: pump sequencing at the pump station, ratio at dosing, an oxygen target in aeration.
Typical measurements
| Measurement | Where | What automation uses it for |
|---|---|---|
| Level | Well, tank, wet well | Pump start/stop, overflow and dry-run protection |
| Pressure | Pump outlet, transmission line | Pump control, early notice of a line problem |
| Flow | Pump outlet, line, dosing point | Dosing ratio, consumption and production records |
| pH, ORP, free chlorine | Disinfection and chemical dosing points | Dosing feedback, quality monitoring |
| Turbidity | Filter outlet | Quality monitoring, filter backwash decision |
| Dissolved oxygen | Aeration basin | Blower or aerator speed adjustment |
| Motor current and status | Pump, blower, mixer | Fault, dry-run and running-hours tracking |
For how an analog signal travels from the sensor to the PLC and gets scaled, see our analog measurement chain guide.
Automation and SCADA topics
- Local operation first. Control logic runs in the field PLC; if the link to the center drops, pumps and dosing keep running locally.
- Pump management. Start and stop by level, rotating the duty pump, switching to the standby, and restarting pumps in sequence rather than all at once after power returns.
- Dosing. Fixed or flow-proportional dosing; putting dosing into a safe state when a measurement fails.
- Alarm design. A priority scheme that separates important alarms from noise; see the alarm management guide.
- Data and reports. Running hours, flow totals, alarm history and trends in one place.
- Remote access. The access method and network separation follow your site’s rules; see the small water and wastewater plant SCADA guide.
Common field problems
- Level measurement. Grease, foam, sludge and condensation affect the measurement method; one sensor type may not suit every well.
- Pump short cycling. If the gap between the start and stop levels (hysteresis) is too narrow, the pump starts and stops at short intervals.
- Noisy analog signals. A signal cable that shares a tray with a drive cable, or whose shield is grounded wrongly, gives a fluctuating reading. The shield grounding guide covers this.
- Weak communication. At remote points the GSM signal or radio link can fluctuate; plan for data loss and alarm delay from the start.
- Moisture and condensation in the panel. In damp wells and pump rooms the panel protection class and the need for a heater should be considered separately.
- Undocumented changes. Settings and wiring changed on site over time make the next intervention harder if the drawings were never updated.
What we need to quote
- How many points are there (wells, pump stations, tanks, treatment) and how far apart are they?
- Which measurements and which equipment (pumps, valves, drives, dosing pumps) does each point have?
- Is there an existing PLC, HMI or SCADA; which brands and communication interfaces are in use?
- Is there a P&ID, an electrical project, or at least photos and an equipment list?
- What is the communication infrastructure (GSM, fiber, radio, an existing network)?
- What are the remote access, reporting and alarm notification needs; is there an authority or operator specification?
- Shutdown window: for how long can the system be stopped?
You do not have to answer all of these; a two-line description is enough to start. Time and cost depend on the project.
Related notes
- Water and wastewater SCADA: architecture and site checklist
- SCADA for a small water and wastewater plant
- 4-20 mA or 0-10 V?
- FAT checklist
How we proceed
We first examine the process flow and the current state of the plant and put the scope in writing. Design, panel and software are handled by the same team. We test the panel at the factory before sending it to site. Regulatory and specification requirements differ for every plant; they are clarified at the start of the project.