Tag: SCADA
Technical notes tagged SCADA.
Operator Command Safety: Confirm, Lock, Quality
Reducing wrong clicks and commands based on stale data in SCADA: risk classes, confirmation window, press-and-hold, rate limit, quality lock.
Testing SCADA Screens Without a PLC
Trying a SCADA screen with simulated values before the PLC and panel are ready: what to test, which scenarios you need, and what simulation does not prove.
PLC and SCADA Tag Naming: Structure and Rules
PLC and SCADA tag naming: layers, name structure, rules, I/O list columns and change control, with a made-up pump station example.
Data Types for Tags: Handling Repeated Devices
Many identical pumps or motors? Do not create tags one by one: data types, an instance table, member settings and how to manage a type change.
HMI vs SCADA: Differences and How to Choose
HMI vs SCADA explained with PLC and historian: how they differ and how to choose by tag count, PLC count, alarm logging, remote access and reporting.
Small-Plant SCADA Architecture: 1-5 PLCs
SCADA architecture for 1-5 PLCs and about 5000 tags: layers, server/client, protocol choice, redundancy, network segmentation and tag counting.
FAT checklist: panel and SCADA acceptance test
A practical checklist for panel and SCADA factory acceptance testing (FAT): documents, visual checks, I/O, communication, alarms, scenarios, open items.