From an automation point of view, a biogas plant differs from an ordinary process plant: you manage a living biological system, a flammable gas and a gas engine at the same time. In this post we summarize the automation layers from the digester to the cogeneration engine, what to monitor in SCADA, and the safety side. What follows is a general engineering framework; threshold values and safety functions are determined at each plant by its own risk assessment.
Process chain
Substrate reception and feeding, pre-storage and mixing, digester (anaerobic digestion), gas holder (membrane), gas treatment (drying, H2S removal), gas engine or cogeneration (CHP), flare for excess gas, and digestate storage.
Automation layers
| Section | Job of the automation | What to monitor / control |
|---|---|---|
| Feeding | Scheduling, dosing | Scale or feeding time, feeding program |
| Digester | Heating and mixing | Temperature (PT100), level, mixer operation and motor protection, pressure safety |
| Process health | Early warning | Trends of analysis results such as pH and FOS/TAC |
| Gas line | Storage and transport | Gas holder level/pressure, blower, condensate drain, shut-off valves |
| Gas analysis | Quality and safety | CH4, CO2, H2S, O2 |
| Flare | Burning excess gas safely | Opening condition, ignition, flame supervision, interlocks |
| CHP | Electricity generation | Communication with the engine controller, permissive and alarm signals |
Digester
The digester can be operated in the mesophilic or thermophilic regime; the target temperature and retention time are determined by the substrate and the plant design, so we do not give a single value here. What matters for automation is the heating circuit that keeps the temperature constant, regular and traceable operation of the agitators, and level and pressure alarms. Foaming, acid accumulation and feeding fluctuations are typical signs of process instability; this is why the FOS/TAC (volatile fatty acids / alkalinity ratio) and pH trends are monitored. Thresholds are plant-specific; they must be set using your own plant’s historical data.
Gas line, H2S and analysis
H2S in the gas affects engine life and oil quality; the limit the manufacturer accepts is written in the engine and warranty terms, so refer to that document. H2S combined with moisture creates an acidic environment; for this reason the sample line (drying, filter) and analyzer maintenance are the most commonly forgotten topics. Gas analyzers are usually connected to SCADA with a 4-20 mA and/or Modbus output. In micro-aerobic H2S removal, air dosing is sensitive: too little air leaves H2S high, too much air upsets the process. This is why measurement-based control (with O2 and H2S feedback) is considered.
Flare and CHP
The flare should open automatically at the gas holder’s upper level, while the engine is out of service, or on low-quality gas, and it should operate with flame supervision and a safety interlock. On the CHP side there is the engine manufacturer’s own controller; the communication protocol between it and SCADA varies by manufacturer. Before purchase, ask the manufacturer in writing which interfaces (serial, Ethernet, dry contact) the engine offers.
ATEX and safety
Areas such as the inside of gas holders and the gas space of the digester are critical zones with respect to explosive atmospheres. In Turkey, the employer’s obligation is governed by the Regulation on the Protection of Employees from the Dangers of Explosive Atmospheres (Çalışanların Patlayıcı Ortamların Tehlikelerinden Korunması Hakkında Yönetmelik) (Official Gazette 30.04.2013, no. 28633): an explosion protection document is prepared, and zones are classified and marked. Zone classification and distances are plant-specific; for gas atmospheres the regulation relies on application guides that point to the IEC/EN 60079-10-1 approach. The equipment you select (sensors, enclosures, motors, lighting) must carry an Ex marking suitable for the zone.
The methane content and explosion limits of biogas depend on its composition; sources give different ranges. For this reason, base the design not on a generic figure but on your plant’s gas composition and the standards. The reliability level of safety functions (e.g. flare flame loss, gas line shut-off on overpressure) is also determined by the risk assessment; the decision “this function shall be at this level” is not one the automation company can make alone.
Why does operating economics concern automation?
According to an assessment published in the sector, Turkey has roughly 101 biogas plants, licensed and unlicensed, with roughly 313 MW of installed capacity; the support mechanism applied for a period of 10 years. From 2022, plants whose support period ended moved to the free market; a significant share of them have closed or run only during hours when electricity prices are high. Waste supply costs have also risen. This puts two demands on automation: to make production, gas and feeding cost measurable, and to be able to run the plant flexibly according to market conditions. For current support and regulation details, refer to official sources.
What should be visible in SCADA?
- Digester temperature, level and pressure trends
- Mixer and pump status, fault counters
- Gas holder level, gas flow, CH4/CO2/H2S/O2 trends
- Flare status and opening records
- CHP production, status and alarms
- Alarm history, event time and acknowledgment information
- VPN or secure remote access; no HMI exposed to the internet
Checklist
- Zone classification and explosion protection document are ready; equipment suits the zone
- Sensor outputs (4-20 mA, Modbus) and scope are listed
- Gas analyzer sample line and maintenance interval are planned
- The H2S limit was taken from the engine manufacturer’s document; alarm and action thresholds are defined
- Flare opening conditions, ignition and flame supervision have been tested
- The CHP communication interface was obtained from the manufacturer in writing
- Sampling and recording arrangements for FOS/TAC and pH monitoring are set
- Mixers and pumps have motor protection and a fault alarm
- A risk assessment has been done for the safety functions
- PLC/SCADA program backup and documentation have been delivered
If you want to renew the automation of an existing plant or plan the SCADA of a new one, take a look at our SCADA installation page.